Project case
2020 Poland Small Beer Filling Line 500 Bottles Per Hour
Project Name: Small Beer Filling Line 500 Bottles Per Hour. Background: The Polish customer is running a small brewery with limited investment budget. So that how to tailor this production line poses challenges to our engineering design, production,
- Country / Region
- Poland
- Beverage / Liquid
- Beer
- Container Type
- To be confirmed
- Target Capacity
- To be confirmed
Project details
Project Overview
Project Name:Small Beer Filling Line 500 Bottles Per Hour
1. Project Background
The Polish customer runs a small brewery with a limited investment budget. Tailoring an efficient production line within these budget limits posed unique challenges for our engineering design, production, installation, and commissioning. Ultimately, we determined a customized solution that improved machine performance without compromising the high quality of the beer production.
2. Project Milestone Timeline
- May 2020: Contract officially signed.
- October 2020: On-site equipment installation completed.
- October 21, 2020: Comprehensive staff training conducted.
- November 15, 2020: The overall operation of the production line is highly stable.
3. Training & Operational Support
During the training and early production phases, we helped the client master key operations, including:
- Spare parts replacement and exchange.
- Critical pre-start observation details.
- Equipment cleaning, sanitation, and ongoing maintenance.
- Resolving minor initial details such as cap gnawing issues and valve slurry phenomena, for which we provided timely and perfect technical solutions.