SinoPAK Machinery
SinoPAK beer canning production line in factory

Beer Filling Line

Complete Beer Production Line Solutions

A Complete Beer Solution from Fermentation stage, beer filtration, water treatment system, blending system, washing, filling and capping, pasteurization, labeling, package, and palletizing.

Applications beer
Container Glass Bottles, Cans
Filling Method Low-Temperature Isobaric Filling
Capacity Planning Configured by Container, Output and Packaging Speed
Project Scope Fermentation stage, Water Treatment system, Blending system, beer filtration, Filling, Warming, Packaging and palletizing
Choose By Product & Package Type

Beer Production Solutions by Package Type

Beer behaves differently in glass bottles and cans. Start with the package format, then SinoPAK configures filling, sealing, warming, coding, labeling and packing around the line target.

Glass beer bottles on SinoPAK isobaric filling line

Glass Bottle Beer production Line

For Beer in Glass bottles. DXGF isobaric filler with warming, coding labeling and package.

Beer cans on SinoPAK rinsing filling seaming line

Can Beer production Line

For canned beer with rinsing, filling, seaming, coding and packing integrated in one line.

How the Line Works

Complete Beer Production Process

Beer production process, from Fermentation stage, beer filtration, washing, labeled and packed finished products.

Water Treatment
Fermentation stage
Beer filtration
Pasteurization
Isobaric Filling
Capping / Seaming
Bottle Warming
Coding & Labeling
Packaging & Conveying
Build the Line Around Carbonation & Oxygen Stability

Build the Line Around Carbonation Stability

A competitive beer production line must attach great importance to the filling and sterilization processes. Recommended to select an isobaric beer filling machine whose filling valves are made of 304/316 stainless steel.

  • Equipped with pre-vacuumizing and secondary CO₂ purging functions, and adopt long-tube filling valves to fully displace the air in the bottle with carbon dioxide, so as to effectively reduce oxygen residue.
  • The filling speed of the whole line matches the production capacity of 1000~15000 bottles per hour.
  • Equipped with a CIP cleaning-in-place system.
Get Technical Proposal →
Configure Your Beer Production Line

Find the Right Solution for Your Needs

Need a custom solution? Talk to our engineers →

Core Equipment for a Beer Production Line

Reliable Machines. Proven Performance.

Every complete line is configured as a system, from front-end processing through filling, closure, labeling and packaging.

Water Treatment System — SinoPAK

Water Treatment System

Provides process water according to the beer-production requirement.

View Machine
Fermentation Equipment — SinoPAK

Fermentation Equipment

Included in the line scope.

Beer Filtration System — SinoPAK

Beer Filtration System

Included in the process scope.

Beer Filling Machine — SinoPAK

Beer Filling Machine

For glass-bottle beer filling using the confirmed low-temperature isobaric configuration. EXPLORE BEER FILLING MACHINE →

View Machine
Can Beverage Filling Machine — SinoPAK

Can Beverage Filling Machine

For beer cans with filling and seaming. EXPLORE CAN BEVERAGE FILLING MACHINE →

View Machine
Pasteurization / Warming Equipment — SinoPAK

Pasteurization / Warming Equipment

Configured according to the confirmed beer process.

Coding & Marking — SinoPAK

Coding & Marking

Inkjet or laser according to the package and marking requirement.

View Machine
Labeling Machines — SinoPAK

Labeling Machines

For glass-bottle labeling where required.

View Machine
Packaging Machines — SinoPAK

Packaging Machines

For the required secondary pack format.

View Machine
Conveying Systems — SinoPAK

Conveying Systems

Connect filling, labeling, packaging and downstream handling.

View Machine
CIP Cleaning System — SinoPAK

CIP Cleaning System

Supports cleaning of relevant process equipment and pipelines according to the agreed scope.

View Machine
Why SinoPAK

One Partner for the Complete Beer Project

Review production flow, processing area, filling/packaging layout, utilities and expansion.

Get Technical Proposal →

Factory Planning

Review production flow, processing area, filling/packaging layout, utilities and expansion.

Process & Line Engineering

Coordinate fermentation/filtration scope, beer transfer, filling, thermal treatment and packaging.

Equipment & Integration

Match processing equipment, glass-bottle or can filling, closure, labeling, packaging and conveying.

Installation & Commissioning

Support installation, commissioning and production setup according to the agreed project scope.

Project Scenarios

Use Project Scenarios to Confirm the Direction

Typical project situations for this kind of line — verified references are added as they are approved for publication.

Poland Glass Bottle Beer Project — SinoPAK

Poland Glass Bottle Beer Project

CountryPoland
ProductGlass Bottled Beer
Capacity4,000 BPH
New Beer Production Line Project — SinoPAK

New Beer Production Line Project

Capacity Increase or Line Upgrade — SinoPAK

Capacity Increase or Line Upgrade

Explore More Videos →

Beer Production Line Engineering Layout

Translate the Process Into a Practical Factory Layout

Plan the Process and Packaging Flow Before Final Equipment Selection.

Beer Filling Line — reference layout

Request Layout →
Beer Filling Line layout reference

Advantage

  1. Water treatment
  2. Fermentation area
  3. Beer filtration
  4. Product transfer

FAQ

Frequently Asked Questions

A complete line can include water treatment, fermentation, blending, beer filtration, washing, low-temperature isobaric filling, capping or seaming, pasteurization/warming, coding, labeling, packaging, conveying and palletizing. Final scope depends on the project.
Beer is carbonated. The line recommends pressure-controlled filling to support stable filling while managing carbonation.
The line uses pre-vacuumizing and secondary CO₂ purging to displace air in the bottle and reduce residual oxygen before filling.
The line covers both Glass Bottles and Cans. The filling and closure equipment differ by package type.
The line references approximately 1,000–15,000 bottles per hour for the beer filling line.

Start your project

LET'S PLAN YOUR BEVERAGE PROJECT

Tell us the basics. Our team will help with the rest.

Our team will review your message and recommend the next step.

+8618962303086 +8618962303086