Albania 15,000 BPH Bottled Water Project
A highly automated 15,000 BPH PET water bottling line engineered around an irregular second-floor workshop — from bottle blowing through filling and labeling to packing and palletizing.
- Country / Region
- Albania
- Beverage / Liquid
- Bottled Water
- Container Type
- PET Bottle
- Target Capacity
- 15,000 BPH
The challenge
Production Challenges
The customer’s existing production line could no longer keep up with growing market demand, so a capacity expansion was needed. On-site manual operation had to be reduced, which called for a highly automated production line.
The challenge
Customer Pain Point
Describe the situation the customer faced before the project — capacity limits, manual dependence, factory constraints or product goals.
The solution
Solution Highlights
The customer’s workshop sits on the second floor with an irregular layout. SinoPAK carried out a customized line design based on the actual workshop, making optimal use of the available space and achieving high-efficiency operation across the complete line.
The result
Project Result
After installation, the line reached the target capacity, reduced labor pressure in the packing area, and achieved more stable, more consistent operation across the complete line.
On site
Watch the Albania Water Line in Production
The complete PET water line running on site — bottle blowing, filling, labeling, packing and palletizing.