After two previous cooperations between Arenel (Pvt) Ltd and SinoPAK, Arenel (Pvt) Ltd has trust in SinoPAK. Arenel (Pvt) Ltd once again asked SinoPAK to help rectify the original 12,000 BPH water production line. Arenel (Pvt) Ltd's original 12,000 BPH production line machine speed can only reach 8,000 BPH, and the blow molding machine is no longer running, the original manufacturer's service is not in place, resulting in the 12,000 BPH production line has been unable to smoothly and stably produce. SinoPAK reorganized the layout of Arenel (Pvt) Ltd's 12,000 BPH water production line, replaced the blow molding machine and blow molding machine with stable output, and added buffer conveying to ensure stable production of 12,000 BPH with high quality.
The cooperation between the two companies has been a complete success and we will continue to cooperate in the future.