Project Name:4000BPH Beer Glass Bottle Filling Line Project in Poland

1. Project Background

In March 2022, Mr. Tomasz Zieliński, a client from Poland, contacted SinoPAK TEC through our website. Mr. Zieliński was already operating a small beer filling production line and had established a stable market demand and sales channels. However, as the demand for his products grew, his existing production line could no longer meet the increasing production requirements. To address this challenge, Mr. Zieliński decided to invest in a new beer filling production line.

2. Project Implementation

Project Objectives:

  1. Production Capacity:
    The new production line needed to achieve an output of 4,000 bottles per hour, using glass bottles with crown caps.

  2. Automation Level:
    The line was required to be highly automated to minimize manual intervention and maximize production efficiency.

  3. Equipment Configuration:
    The production line had to include full-process equipment, covering washing, filling, capping, and labeling, ensuring seamless coordination between all stages.

  4. Quality Control:
    The equipment needed to feature strict quality control systems to ensure that the beer produced met international drinking standards.

3. Why the Client Chose SinoPAK TEC:

Initially, Mr. Zieliński reached out online to inquire about technical issues related to carbonated filling equipment. Given that he was already operating a small-scale beer filling production line, our sales team, with the support of our technical experts, provided constructive suggestions that helped Mr. Zieliński resolve his issues. Additionally, we offered him spare parts for his existing filling machine at a favorable price, further solidifying his trust in our company.

When Mr. Zieliński decided to expand his production capacity in 2023, he chose to collaborate with SinoPAK TEC to implement a new filling line.

4. Challenges and Solutions During Commissioning:

4.1 Excessive Foam During Filling:

  • Solution: The foaming issue was resolved by reducing the filling speed and pressure and controlling the temperature of the beer before filling.

4.2 Conveyor Belt Misalignment During Operation:

  • Solution: We adjusted the tension of the conveyor belt and realigned the rollers to ensure even stress distribution and proper operation.

5. Client Feedback:

Mr. Zieliński expressed great satisfaction with the solutions provided by SinoPAK TEC, particularly praising the efficiency and stability of the production line and the promptness of our after-sales service. He acknowledged that this production line has laid a solid foundation for the future growth of his company and looks forward to continuing to benefit from SinoPAK TEC’s advanced technology and high-quality service in future collaborations.

4000BPH Beer Glass Bottle Filling Line Project in Poland 4000BPH Beer Glass Bottle Filling Line Project in Poland 4000BPH Beer Glass Bottle Filling Line Project in Poland 4000BPH Beer Glass Bottle Filling Line Project in Poland 4000BPH Beer Glass Bottle Filling Line Project in Poland 4000BPH Beer Glass Bottle Filling Line Project in Poland4000BPH Beer Glass Bottle Filling Line Project in Poland